Real-time measurements in self-generating power facilities
June 6th 2014 Royal Decree 413/2014 requires photovoltaic systems with and installed power higher than 1MW, or forming part of groups of more than 1 MW, to send telemetry in real time to the system operator.
Telecontrol STM has commissioned more than 150 installations with real time measurements distributed throughout the Iberian peninsula..
The main tasks performed are:
- Review wiring cells
- Review remote wiring closet
- Local tests hub RTU (Remote Terminal Unit) and RTU
- Testing and reporting measures converter injection suitcase according to the installation (TI'sy TT's)
- Testing SCADA ED, EA and SD.
- Testing COR ED, EA and SD.
Once again faithful to his style , Telecontrol STM continues to maintain high standards and dedication in all services provided